 |
[ < Previous Page ] [ Product Category ] [ Next Page > ]
Berkeley Jet Pump Rebuilds & Blueprinting:
"Start Original, Stay Original" - Making the best better again!
Each pump is disassembled, cleaned and inspected. The shaft
is checked for straightness. The pump is then assembled using all
new parts including your choice of aluminum impeller size, bearings
(pre greased), impeller nut, seals, packing, bearing snap ring, impeller
key-way and a complete gasket set. Jet pumps are brought back to
stock specifications and have a one year warranty on parts and labor.
Only genuine Berkeley parts are used. No inferior import pieces. Click on the part number to
check pricing or place an order.
Berkeley
Factory Jet Pump Rebuilds For
Berkeley, American Turbine, Legend, Dominator
Call about special shipping! |
|
Description
of Blueprinting Labor |
150-2001
Stage 1 - Disassemble, clean, inspect all parts:
- R&R parts (wear ring, bearings, bushings, seals).
- Machine parts as necessary for proper fit and
clearance (bearing cap. shaft, impeller).
- Modify inlet side of impeller for less cavitation
and more flow.
- Lube and precision assemble.
|
150-2003
Stage 2 - All the above, plus:
- Add stuffer to bowl to improve water flow off
impeller into bowl
|
150-2004
Stage 3 - All the above, plus:
- Modify bowl inlet vanes for smooth flow.
- Modify bowl outlet vanes for less turbulence
and straighter exit flow.
|
150-2005
Stage 4 - All the above, plus:
- Double bolt suction piece, bowl, and bearing cap.
|
150-2006
Option A
- Ride plate modification with shoe, polished
plate and cradle assembly, stainless
steel fastener kit.
|
|
|